Saw-cut joints
Forklift wheels hammer the joint edges until they chip and spall. We fill joints flush with polyurea so wheels roll over them instead of dropping in.
Forklifts, pallet jacks and constant turns wear a floor out at the joints and in the aisles first. We match the system to your traffic, fill the joints and install around your shifts.
Where it fails
Most of it is predictable from the traffic pattern, so the bid plans for it before the first coat goes down.
Forklift wheels hammer the joint edges until they chip and spall. We fill joints flush with polyurea so wheels roll over them instead of dropping in.
Tires turn in the same lanes all day and grind the surface. The urethane topcoat is there to take that abrasion so the epoxy underneath doesn’t.
Heat, rain and grit come in at the docks and get tracked inside. These are often the first areas to wear.
Dragged pallets and steel-wheel jacks gouge thin coatings. Where they run, we spec the thicker Heavy-duty system.
The system
Most warehouse floors take the Standard system. These are the exceptions we look for at the walkthrough.
How it runs
The rest of the building keeps moving while we work one zone at a time.
We walk the floor and map aisles, docks, racking and charging areas, then moisture-test the slab before pricing.
We split the floor into zones so racks and inventory move once, and shipping keeps running in the rest of the building.
Diamond grinding or shot-blasting to CSP 2–3, with HEPA dust collection so dust stays off your inventory.
Joints filled, cracks repaired, coating and topcoat down, then aisle and safety lines. Every stage logged and photographed.
We walk the finished zone with you, hand over the log and photos, and tell you when forklifts can go back on it.
Photo record
These frames fill with photos from our own Texas jobs as they finish. No stock photos.
FAQ
Something else? Call (000) 000-0000.
Yes. We either coat around fixed rack legs or move racks zone by zone. Rack moving is its own line on the bid, so you can choose.
It depends on the system and the slab temperature. We put the return-to-service time for each zone in the bid, so you can plan around it.
Not always. If the slab is in good shape and you mainly want less dust and easier cleaning, densifying and polishing (System 01) can be the better buy. We’ll tell you at the walkthrough.
Yes. Aisle lines, pedestrian walkways, forklift lanes and safety zones go on the bid as their own line.