Where it fails

Warehouse floors fail in the same four places.

Most of it is predictable from the traffic pattern, so the bid plans for it before the first coat goes down.

Joints

Saw-cut joints

Forklift wheels hammer the joint edges until they chip and spall. We fill joints flush with polyurea so wheels roll over them instead of dropping in.

Aisles

Main aisles and turns

Tires turn in the same lanes all day and grind the surface. The urethane topcoat is there to take that abrasion so the epoxy underneath doesn’t.

Docks

Dock doors

Heat, rain and grit come in at the docks and get tracked inside. These are often the first areas to wear.

Pallets

Dragged pallets and steel wheels

Dragged pallets and steel-wheel jacks gouge thin coatings. Where they run, we spec the thicker Heavy-duty system.

The system

Matched to what rolls on it.

Most warehouse floors take the Standard system. These are the exceptions we look for at the walkthrough.

Start with
System 02 · Standard, 15–20 mils with a urethane topcoat
No coating
System 01 · Densify and polish for big-box floors that need a harder, dust-proofed slab with nothing on top to peel
Steel wheels
System 03 · Heavy-duty, about 1/8", where steel wheels and impact run
Charging areas
System 04 · Novolac for battery charging and chemical storage
Line items
Polyurea joint filling, crack repair, aisle and safety striping, rack moving, moisture barrier if the slab tests wet
Timing
Holiday shutdown (Dec 20 – Jan 3), nights and weekends, or phased by zone

How it runs

Built around the shipping schedule.

The rest of the building keeps moving while we work one zone at a time.

  1. Walkthrough + moisture test

    We walk the floor and map aisles, docks, racking and charging areas, then moisture-test the slab before pricing.

  2. Zone plan

    We split the floor into zones so racks and inventory move once, and shipping keeps running in the rest of the building.

  3. Grind or shot-blast

    Diamond grinding or shot-blasting to CSP 2–3, with HEPA dust collection so dust stays off your inventory.

  4. Joints, coating, striping

    Joints filled, cracks repaired, coating and topcoat down, then aisle and safety lines. Every stage logged and photographed.

  5. Walkthrough + warranty

    We walk the finished zone with you, hand over the log and photos, and tell you when forklifts can go back on it.

Photo record

Real jobs only.

These frames fill with photos from our own Texas jobs as they finish. No stock photos.

Job photo
01Joint filling
Job photo
02Aisle after grinding
Job photo
03Finished aisle with striping

FAQ

Warehouse questions.

Something else? Call (000) 000-0000.

Warehouses & 3PL

Can you coat around racking?

Yes. We either coat around fixed rack legs or move racks zone by zone. Rack moving is its own line on the bid, so you can choose.

How soon can forklifts drive on it?

It depends on the system and the slab temperature. We put the return-to-service time for each zone in the bid, so you can plan around it.

Do we even need a coating?

Not always. If the slab is in good shape and you mainly want less dust and easier cleaning, densifying and polishing (System 01) can be the better buy. We’ll tell you at the walkthrough.

Can you stripe aisles and walkways?