Booking holiday-shutdown installs · Dec 20 – Jan 3

Manufacturing & metal fab · Texas Plant floors built for impact.

Dropped parts, carts, steel wheels and cutting fluids. Thin coatings chip in the travel lanes first, so we build thickness where the floor takes the hits.

Where it fails

Plant floors fail where the work happens.

We walk the floor with the people who run it, because the failure points follow the process.

Lanes

Travel lanes

Carts, tuggers and steel wheels run the same paths all day. Thin coatings wear through there first.

Impact

Drop zones

Dropped parts and tools chip thin films. About 1/8" of quartz or slurry takes the hit instead.

Heat

Weld and grind areas

Sparks and hot slag mark any floor. A thick quartz system hides and resists it far better than a thin coat.

Fluids

Coolants and chemicals

Cutting fluids, coolants and solvents break down the wrong coating. Send us the chemical list and we match the system.

The system

Thickness where it’s needed. Not everywhere.

A plant floor rarely needs one system wall to wall. We put the heavy build in the lanes and impact zones and keep the rest efficient.

Travel lanes
System 03 · Heavy-duty, about 1/8"
Assembly and QA
System 02 · Standard, 15–20 mils
Chemical areas
System 04 · Novolac for chemical storage and battery rooms
Line items
Joint filling, crack repair, safety striping and marked work zones
Timing
Planned shutdowns, weekends, or one zone at a time

How it runs

Planned around production.

Downtime costs more than the floor. The schedule is part of the bid, not an afterthought.

  1. Walkthrough + moisture test

    We map traffic, wheel types, drop zones and chemical areas with your team, and moisture-test the slab.

  2. Zone plan

    We sequence the floor around production: shutdown weeks, weekends, or one zone at a time.

  3. Shot-blast or grind

    Shot-blasting or diamond grinding to CSP 2–3 with HEPA dust collection, under OSHA’s silica rule.

  4. Build, logged

    Slurry or quartz broadcast in the lanes, standard system elsewhere, then striping. Every stage logged.

  5. Walkthrough + record

    We walk each zone with you and hand over the install log, photos and return-to-service times.

Photo record

Real jobs only.

These frames fill with photos from our own Texas jobs as they finish. No stock photos.

Job photo
01Shot-blasted slab
Job photo
02Quartz broadcast in the travel lane
Job photo
03Finished zone with safety striping

FAQ

Plant questions.

Something else? Call (000) 000-0000.

Manufacturing

Do we need 1/8" or will a thin coat do?

It depends on what hits the floor. Lanes with steel wheels and drop zones need the heavy build. Assembly and packing areas usually don’t. We’ll mark it zone by zone at the walkthrough.

Can you work around production?

Yes. We install during shutdowns, on weekends, or one zone at a time, and the schedule goes in the bid.

Will it hold up to our chemicals?

Send us your chemical list or safety data sheets. We match the system to them, and use novolac where stronger chemicals are stored.

Can you mark safety zones and walkways?

Yes. Walkways, forklift lanes, work cells and keep-clear zones go on the bid as their own line.